Roofing & solar · reference

Roof guides — everything we know about roofs and solar

The roof decides more about a solar project than the panels do: how the array is attached, how much of the roof can be used, whether an engineer signs the drawings, and what happens at the next re-roof. These guides cover it, written against the 2025 California codes and our own completed work.

Updated September 1, 2026 · By the Cali Energy team · Northridge, CA

136guides on roofing and solar, from code rules to attachment detail
365of our completed installs have the roof covering on record
2025edition of the California codes these guides are written against

Looking for the service rather than the reference? See our roofing work ›

Repair or replace

Reading the symptoms, finding leaks and deciding how much work the roof needs.

Roofing materials

What each covering is good at in Southern California heat, sun and fire zones.

Costs and paying for a roof

What drives the price, what is often left out of a quote, and how people pay.

Permits, codes and contracts

What a re-roof needs on paper, and the rules behind it.

Fire, insurance and weather

Fire ratings, hazard zones, insurance and what storms and wind do to a roof.

How a roof is built

The layers and parts of a roof, named and explained.

Flat roofs

Membranes, coatings, drainage and when a flat roof needs replacing.

Hiring a roofer and the job itself

Quotes, warranties, the replacement itself and upkeep afterwards.

Re-roofing with solar

Doing the roof and the array in the right order.

Energy and the attic

Insulation, radiant barriers and ventilation around the roof.

Start here

If you do not yet know what your roof means for a solar project.

By roof type

Four coverings, four sets of rules.

From our own projects

What our completed installations show, with the method and the limits stated.

Before you install

Decisions that are cheaper to make in the right order.

Code and compliance

The rules that decide what is allowed on your roof.

Attachment, leaks and repairs

Everything that happens where the mount meets the covering.

Warranties and long-term ownership

Who is responsible years from now.

How this section is put together

These are reference pages, not sales pages. Every rule is cited to the section of the California code it comes from, with the edition named — the 2025 codes took effect on 1 January 2026, and a good deal of published roofing advice still quotes the previous numbering.

Where we use our own figures, they come from our completed installations and are published with the number of projects behind them. The methodology — what the dataset is, how a project is counted, which fields are complete and where the limits are — is set out in full on the roof types hub.

If something here is out of date or wrong, tell us and we will fix it. That is worth more to us than the page reading well.