ROOFING

Roof Pitch: What It Means and How to Find Yours

Roof pitch is how many inches a roof rises for every 12 inches it runs horizontally, written as a ratio like 4:12 or "4 in 12." California's residential code states slopes the same way, as units vertical in 12 units horizontal, sometimes with a percent. To convert: the angle in degrees is the arctangent of rise ÷ 12, so 4:12 is about 18.4 degrees and 6:12 about 26.6; the percent is rise ÷ 12 × 100, so 4:12 is 33 percent. You can find your own pitch from the attic with a level and a tape, or with an angle-finder app laid on a rafter, without going on the roof. Pitch decides which coverings are allowed (asphalt shingles need at least 2:12, tile at least 2½:12), how many layers of underlayment go down, and whether OSHA counts the roof as steep, which it does above 4 in 12.

Updated October 9, 2026 · Last fact-checked October 9, 2026 · By the Cali Energy team · Northridge, CA · CSLB #1032379 (B, C-10, C-39) — verify license

Watercolor-style illustration of a Los Angeles house with a shingle roof and a lower garage wing, a pitch triangle marked 12 and 4 drawn on the main roof, and a cutaway attic where a man holds a level against a rafter and measures the rise with a tape, with palms, mountains and the downtown skyline behind
Pitch is the rise in inches for every 12 inches of run: 4:12 is about 18.4 degrees, and you can measure it from the attic with a level and a tape

Pitch, degrees and percent

Pitch converts to an angle and a percent with simple arithmetic.

Each common pitch, with its angle and percent slope
PitchDegreesPercent slope
2:129.5°16.7%
2½:1211.8°20.8%
3:1214.0°25%
4:1218.4°33.3%
5:1222.6°41.7%
6:1226.6°50%
7:1230.3°58.3%
8:1233.7°66.7%
9:1236.9°75%
10:1239.8°83.3%
12:1245.0°100%

The code prints percentages next to some ratios, rounded; where a printed percent and the ratio disagree, go by the ratio. Its tile section, for example, pairs 2½:12 with "25-percent slope," while 2½ in 12 works out to about 21 percent.

How to find your roof's pitch

1. From the attic. Hold a level horizontally against the underside of a rafter, mark 12 inches along the level from where it touches the rafter, and measure straight up from that mark to the rafter. That measurement is the rise: 5 inches means a 5:12 pitch.

  1. With an angle finder. Lay an angle finder or a phone's angle app on a rafter, or on a gable end's trim, read the degrees, and convert with the table or with rise = 12 × tan(angle). A reading of 23 degrees is about 5:12.
  2. From the plans. House plans and permit drawings often show pitch on the sections or elevations, but a roof that's been altered may not match them.
  3. Not from the roof itself. Leave measuring on the roof to someone set up for it; OSHA treats any roof steeper than 4 in 12 as a steep roof for fall-protection purposes.

A house can have more than one pitch, such as a porch or an addition with a lower slope than the main roof, and each plane is measured separately.

What pitch decides

  • Which coverings are allowed. Asphalt shingles need at least 2:12 (R905.2.2); clay and concrete tile at least 2½:12 (R905.3.2). Flatter roofs take low-slope coverings; the full table is in minimum roof slope by material.
  • How much underlayment. Shingles get two layers from 2:12 up to 4:12 and one from 4:12 up, and tile gets a double layer from 2½:12 up to 4:12; see roof underlayment types.
  • How tile is fastened. On battens, field tiles below 5:12 may go unfastened, every other row from 5:12, and every tile from 12:12 (R905.3.8); more in tile roofs and earthquakes.
  • Safety. OSHA's fall-protection rules for construction define a low-slope roof as 4 in 12 or less and a steep roof as anything steeper.
  • Roof area. A steeper roof has more surface over the same footprint, which is how roofers turn a footprint into squares; see how roofers measure a roof in squares.
  • Solar. A flush-mounted array sits at the roof's angle, so the pitch is the panels' tilt.

What we've seen

On a North Hills solar job in April 2025, the crew set an angle finder on the plane before laying anything out, because the pitch sets the tilt toward the sun, the spacing between rows and what the crew needs to work safely; the pitch was measured on the plane, not taken from the plans (the North Hills case). On a Chatsworth roof in 2025–2026, every group of the array sits at 23 degrees, about a 5:12 pitch (the Chatsworth case).

Frequently asked

What does 4:12 pitch mean?

The roof rises 4 inches for every 12 inches it runs horizontally. That's about 18.4 degrees, or a 33 percent slope.

Can a roof have more than one pitch?

Yes. A porch, an addition or a dormer can have its own slope, so each plane is measured on its own, and each has to meet the minimum slope for its covering.

How do I measure roof pitch without going on the roof?

From the attic: hold a level against a rafter, mark 12 inches along it, and measure up to the rafter; the number of inches is the rise. Or read the angle with an angle-finder app on a rafter and convert it.

What pitch is too low for shingles?

Below 2:12. From 2:12 up to 4:12, shingles are allowed with two layers of underlayment.

Is a 6:12 roof steep?

Under OSHA's construction rules, yes: anything steeper than 4 in 12 is a steep roof. A 6:12 roof is about 26.6 degrees.

Related reading

Sources & methodology

Code sections, rules and figures on this page come from the primary sources below. Codes, local requirements and product terms change; each was verified October 9, 2026.

  1. California Residential Code 2025, Chapter 9 Roof Assemblies, R905.2.2, R905.3.2, R905.3.8 and Tables R905.1.1(2) (UpCodes)
  2. U.S. Occupational Safety and Health Administration, 29 CFR 1926.500(b), definitions of low-slope roof and steep roof (eCFR)

We measure every roof plane before we quote

Call (323) 844-7777. We measure the pitch of each plane on the roof itself, not from the plans, and tell you which coverings and underlayment the slope allows. Have ready the address and, if you have them, the house plans.

Prepared by Cali Energy, October 9, 2026. This article is for general educational purposes only and is not legal, tax, financial, engineering, or utility advice. Rates, incentives, codes, permit requirements, equipment specifications, prices, and program terms may change; figures and timelines are estimates, not guarantees. Confirm current requirements with the applicable utility, AHJ, program administrator, manufacturer, or a licensed professional. See our Content Disclaimer. Cali Energy · 19201 Parthenia St, Unit E, Northridge, CA 91324 · CSLB #1032379 (B, C-10, C-39)