Preparing for a roof replacement comes down to three windows. Weeks ahead, settle the material and color, read the contract for the permit, the payment schedule and what happens if the deck is rotten, and line up anything that has to happen before the tear-off: an asbestos survey, or a crew to take solar panels off. In the days before, make room for a debris bin and the material delivery, clear the yard around the house, and plan where to park. On install day, secure pets, leave gates and ladder access open, and expect noise; in the City of Los Angeles, construction is limited to 7 a.m. to 9 p.m. on weekdays and 8 a.m. to 6 p.m. on Saturdays and holidays near homes, and not at all on Sundays. At the end come the walk-through, the nail sweep, the final inspection and the warranty registration. This checklist is as of October 2026.

Updated October 9, 2026 · Last fact-checked October 9, 2026 · By the Cali Energy team · Northridge, CA · CSLB #1032379 (B, C-10, C-39) — verify license

Watercolor-style illustration of a Los Angeles house the morning before a re-roof, with a debris bin and a pallet of shingle bundles in the driveway, a car parked on the street, a homeowner moving planters away from the wall, a dog in a pen by an open gate, a ladder against the house and a checklist with a shingle sample in front, with palms and mountains behind
Weeks before, settle the color and the contract; the days before, make room for the bin and park on the street; on install day, secure pets and open the gates

It covers houses in the Los Angeles area. The steps the crew takes, in order, are in the roof replacement process, and how long each takes in how long a roof replacement takes.

The checklist

The whole job on one page, in the order it comes up. The sections below explain each line.

What to do before and during a re-roof, and why (Owens Corning's homeowner guide, 2025; Los Angeles rules)
WhenWhat to doWhy
Weeks beforeChoose the material and color, and check it against the cool-roof rule if more than half the roof is replacedThe material can't be ordered until the color is final
Weeks beforeRead the contract: who gets the permit, the payment schedule, and what happens if the deck turns out to be rottenCalifornia sets the contract terms, from the down payment to change orders
Weeks beforeAsk whether an asbestos survey is needed, and get it done before the tear-off is scheduledIn most of the Los Angeles area the air district's rule calls for one before a renovation, whatever the roof's age
Weeks beforeIf there's solar on the roof, schedule its removal and reinstallation around the roofingThe array has to come off before the old roof does
Days beforeAgree where the bin and the material will go, and plan to park on the streetThe bin can arrive a day or two early, and material may go on the roof or the drive
Days beforeClear bikes, planters, garden tools and anything else near the house; ask whether to cover plantsTear-off is the messiest part of the job
Days beforeTell the neighborsIt's noisy
Install daySecure pets, unlock gates, keep the ladder spots clearThe crew needs access to every side of the house
AfterWalk the job with the roofer, check the nail sweep, register the warrantyLoose nails, and a warranty that may need registering
AfterIn the City of Los Angeles, get the owner's statement notarized for the inspectorIt goes to the inspector before the final

Weeks before

  • The material and the color. Owens Corning's homeowner guide puts it plainly: the shingle color has to be final before the contractor can order. In Los Angeles, a re-roof covering more than half the roof also has to meet the cool-roof rule, which can rule out a color, as it did with a gray low-slope membrane on our 2024 Canoga Park job; see the cool-roof requirement on a re-roof.
  • The contract. California's contractors board sets the terms of a home improvement contract: a down payment of no more than $1,000 or 10% of the price, whichever is less; a written payment schedule that doesn't run ahead of the work; and who gets the permit. What happens if the deck is rotten belongs in it too; see rotted roof decking and your estimate.
  • Asbestos. In most of the Los Angeles area, the air district's rule calls for an asbestos survey before a renovation, a re-roof included, with exceptions for small jobs and owners doing the work themselves; see asbestos in old roofs.
  • Solar. An array comes off before the tear-off and goes back after. On a 2024 Reseda job, the modules and hardware were stored in the owners' garage for the six days in between. How that's done is in solar removal and reinstall.
  • Working from home. Owens Corning notes that you can usually stay home during the work, but it's very noisy; plan calls and naps accordingly.

The days before

  • The bin and the delivery. A dumpster may arrive one or two days before the work starts, and the shingles and other material a few days before or on the morning of the first day, either on the roof or in the driveway. Agree where they go so a car isn't trapped in the garage; if the bin has to sit in the street, ask the roofer who arranges any permit the city requires. On our 2025 Woodland Hills job, the plywood came a day ahead of the rest of the material.
  • The yard. Clear anything near the house that could be hit or get in the way: bikes, basketball hoops, planters, garden tools, statues. Ask whether the crew covers flowers and shrubs along the walls; if not, cover them yourself. Clear any pet waste where the crew will walk.
  • Parking. Plan to park on the street while the bin and the material take the driveway.
  • The neighbors. A few days' notice of the noise goes a long way.
  • Work hours. In the City of Los Angeles, the municipal code bars construction work with loud tools between 9 p.m. and 7 a.m., and near homes it limits Saturdays and national holidays to 8 a.m. to 6 p.m. and bars Sundays, for deliveries of construction materials as well as the work itself (LAMC 41.40). Other cities set their own hours.

Install day

  • Pets and gates. Secure pets, and tell the crew which gates have to stay closed.
  • Access. Unlock gates and keep the places where ladders go clear on every side of the house.
  • Inside. Ask the roofer whether anything stored in the attic, or hanging near the ceiling, should be moved or covered while the old roof comes off.
  • Special requests. Settle in advance anything like the use of a bathroom.
  • Questions. You can watch and talk to the crew; a supervisor usually checks on the job during the day.

After the last shingle

1. Walk the job with the roofer and check that everything in the contract was done.

  1. Check the cleanup. Owens Corning's guide says the roofer will usually sweep the property for loose nails; our crews sweep the yard with a magnetic roller at the end of each work day. Ask for a second sweep if you find nails.
  2. The final inspection. In the City of Los Angeles, the owner completes, signs and notarizes LADBS's Owner Statement and Acknowledgment of Compliance and sends it to the inspector before the final; see roof permit in Los Angeles.
  3. The warranty. Find out before signing whether you or the roofer registers the manufacturer's warranty, and keep it with the permit final; what the warranties cover is in roof warranties explained.

Frequently asked

Do I need to be home during a roof replacement?

Not necessarily, but you can be. Owens Corning's homeowner guide says that in most cases you can be home during the work, though it's very noisy. What matters is that the crew has access: gates unlocked, pets secured and the ladder spots clear.

What time can roofers start work in Los Angeles?

In the City of Los Angeles, not before 7 a.m. on weekdays, and not before 8 a.m. on Saturdays and national holidays near homes, under LAMC 41.40; work with loud tools stops by 9 p.m. on weekdays and 6 p.m. on Saturdays and holidays, and construction near homes isn't allowed on Sundays. Material deliveries follow the same hours. Other cities have their own rules.

Where does the dumpster go during a roof replacement?

Usually in the driveway, arriving a day or two before the work starts, as Owens Corning's guide describes. Agree on the spot with the roofer so a car isn't trapped, and ask who arranges any permit if it has to go in the street.

Should I cover things in my attic before a re-roof?

Ask the roofer. Tear-off is the messiest part of the job, and the roofer can tell you from your deck whether anything stored in the attic should be moved or covered.

Do I need to do anything for the final inspection?

In the City of Los Angeles, yes: the owner completes, signs and notarizes LADBS's Owner Statement and Acknowledgment of Compliance and gives it to the inspector before the final. Other agencies have their own steps.

Related reading

Sources & methodology

We'll walk you through the schedule before we start

Call (323) 844-7777. Before the tear-off we go over the dates, where the bin and the material will go, what we need access to, what happens with any solar on the roof, and what the inspector will ask for at the final. Have ready the address, your material and color choice, and any gate codes, pets or parking limits we should know about.

Prepared by Cali Energy, October 9, 2026. This article is for general educational purposes only and is not legal, tax, financial, engineering, or utility advice. Rates, incentives, codes, permit requirements, equipment specifications, prices, and program terms may change; figures and timelines are estimates, not guarantees. Confirm current requirements with the applicable utility, AHJ, program administrator, manufacturer, or a licensed professional. See our Content Disclaimer. Cali Energy · 19201 Parthenia St, Unit E, Northridge, CA 91324 · CSLB #1032379 (B, C-10, C-39)