Prices · Updated October 20, 2026
Typical prices
Price ranges from our 2026 jobs in Los Angeles and the San Fernando Valley, with the permit included. Use them to plan a budget before you call us.
These ranges show what our customers typically pay. They are not a quote. The exact price comes in a written proposal after a site visit, once we have seen your roof, electrical panel and utility bill.
Solar
- $3.10 per watt (DC) — Installed solar, cash, base price
- $10,000–$12,500 per system — 4 kW solar system, installed
- $15,000–$18,000 per system — 6 kW solar system, installed
- $20,000–$24,000 per system — 8 kW solar system, installed
- $1,500–$2,000 per panel — Add panels to an existing system
- $250–$350 per panel — Remove and reinstall panels for a reroof
- $500–$1,500 per system — Critter guard under the panels
Home batteries
- $14,000–$16,000 per install — Tesla Powerwall 3, one, installed
- $23,000–$25,000 per install — Tesla Powerwall 3, two, installed
- $8,000–$10,000 per install — Enphase IQ Battery 5P, installed
- $12,000–$15,000 per install — Enphase IQ Battery 10C, installed
- $2,000–$4,000 added to the battery price — Adding a battery to an existing solar system
- $800–$1,800 per install — Backup (critical loads) panel
Solar service and repair
- $300–$600 per visit — Service call and diagnostics, system not producing
- $700–$1,000 per job — String inverter replacement, labor (inverter not included)
- $350–$650 each — One microinverter replacement, labor
- $20–$40 per panel — Panel cleaning
Electrical
- $3,000–$4,500 per job — Main panel replacement, panel only
- $3,000–$4,500 per job — Main panel + meter / mast / service (usually 100→200 A)
- $6,000–$15,000+ per job — Trench, underground service or panel relocation
- $800–$1,200 per install — Level 2 EV charger install, short run, panel nearby (charger not included)
- $1,000–$2,000 per install — Level 2 EV charger install, long run (charger not included)
- $1,500–$3,000+ per install — Level 2 EV charger install, detached garage with trench (charger not included)
- $1,000–$2,000 added — Subpanel for the charger
How to read these prices
- Ranges come from our jobs in Los Angeles and the San Fernando Valley in 2026.
- The permit and installation are included unless the line says otherwise, for example "labor" or "charger not included".
- A price with "+" has no fixed top: a long trench or an older service can cost more.
- Prices are current as of October 20, 2026.
Need an exact price?
Call us or send a request. We visit, check the roof and the electrical panel, and send a written proposal.
Request an estimate Call +1-323-844-7777