Project gallery · Encino, CA

Completed solar projects in Encino, CA

Cali Energy is a local, full-stack-licensed solar installer and battery-storage company serving Encino — part of the City of Los Angeles served by LADWP. Because LADWP isn't on the CPUC's NEM 3.0 tariff, net metering in Encino stays more favorable than in neighboring SCE areas, so paybacks remain strong. We're based in Northridge and do every step in-house — solar panels, battery backup, roofing and electrical — under one CSLB license (#1032379: B, C-10, C-39). Below are real Encino installs, from a 4.8 kW rooftop to a 12.3 kW system.

Get a free Encino solar estimate
Looking for local details rather than photos? Utility rules, permits, costs and timelines for Encino are on our Encino service area page.

Recent solar installs in Encino

11 projects completed across Encino — a few of them below.

12.3 kW solar panel array on a tile roof in Encino, CA
Rooftop solar installation by Cali Energy in Encino, CASolar panel mounting detail on a tile roof in Encino, CACompleted residential solar project in Encino, CASolar array close-up in Encino, CA

12.3 kW on a tile roof — Encino

A 12.3 kW system on a tile roof in Encino — 30 panels, Enphase IQ8A, ~18,600 kWh/year. Installed 2025. Clean, low-profile panel layout that follows the roof lines.

12.3 kW30 panelsTile roof2025
Rooftop solar installation by Cali Energy in Encino, CA
Solar panel mounting detail on a composition shingle roof in Encino, CACompleted residential solar project in Encino, CASolar array close-up in Encino, CA

10.5 kW rooftop solar — Encino

A 10.5 kW system on a composition shingle roof in Encino — 28 Q CELLS Q.PEAK DUO BLK G6 panels, Enphase IQ7 microinverters. Installed 2022. Sized to cover most of the home's annual electricity use.

10.5 kW28 panelsEnphase IQ7 microinvertersShingle2022
Solar panel mounting detail on a composition shingle roof in Encino, CA
Completed residential solar project in Encino, CASolar array close-up in Encino, CAHome solar installation in Encino, CAFinished rooftop solar panels on a Encino home

7.9 kW rooftop solar — Encino

A 7.9 kW system on a composition shingle roof in Encino. Sized for the home's full daytime usage.

7.9 kWShingle
Completed residential solar project in Encino, CA
Solar array close-up in Encino, CAHome solar installation in Encino, CAFinished rooftop solar panels on a Encino homeResidential PV system installed in Encino, CA

7.74 kW rooftop solar — Encino

A 7.74 kW system on a composition shingle roof in Encino — Enphase IQ8A. North-facing modules were reverse-tilted for extra output.

7.74 kWEnphase IQ8AShingle
Solar array close-up in Encino, CA
Home solar installation in Encino, CAFinished rooftop solar panels on a Encino home

7.7 kW rooftop solar — Encino

A 7.7 kW system in Encino. Installed 2021. Included a new main service panel.

7.7 kW2021
Home solar installation in Encino, CA
Finished rooftop solar panels on a Encino homeResidential PV system installed in Encino, CA

4.8 kW rooftop solar — Encino

A 4.8 kW system on a composition shingle roof in Encino. Installed 2021. Designed for daily bill offset and long-term energy savings.

4.8 kWShingle2021
Finished rooftop solar panels on a Encino home
Residential PV system installed in Encino, CAsolar panel array on a composition shingle roof in Encino, CA

Rooftop solar — Encino

A rooftop solar system on a composition shingle roof in Encino. Completed end-to-end by our in-house crew.

Shingle

Project stories from Encino

Twelve Encino case studies go further than the photographs above — what the roof was, what the service took, how the permit and the interconnection actually ran, and what happened after the system was switched on.

Our services in Encino

Encino housing runs from mid-century homes, with a median build year of 1956 across the 10,275 single-family homes in ZIP codes 91316 and 91436, to new construction, and Cali Energy has put solar on both. On one new Encino house the handover package included a map tying every microinverter's serial number to its position on the roof, delivered the day after the final in June 2022.

Main panel upgrades

LADWP's meter spot sheet can set conditions for the service equipment itself. On a 2018 Encino job it called for a 22,000-amp interrupt rating at the service, a clear and level working space in front of it and three feet between the electrical and the gas; we checked the equipment against all three, and the system was switched on in January 2019.

Main panel upgrades in Encino →

Home batteries

One of the eight systems we monitor in Encino's ZIP codes runs with a battery. On our Encino battery project the battery is mounted six inches from the interconnect device it feeds, well inside the five-foot distance at which the electrical code asks for extra overcurrent protection, and the reviewer approved the plans the afternoon that distance was confirmed; the house has had backup since May 2022.

Home batteries in Encino →

Solar repair

Eight systems in Encino's ZIP codes report to our monitoring, three of them for more than five years. On a new Encino house whose array went up during construction, the optimizers stayed dark when the power was first turned on in February 2023; we established communication at the array the next morning, and the system was producing two days later.

Solar repair: how we do it →

Roofing

On a 2019 Encino re-roof we filed the LADWP application first, so the utility review was already moving when both permits, roofing and solar, came through on one day, and the house had permission to operate twenty-eight days after the application. Two years later, on another Encino house, twenty squares of Class A shingle went on before the array, which was switched on in November 2021.

Roofing in Encino →

Why Encino homeowners choose Cali Energy

Full-stack, in-house

One licensed contractor covers solar, battery, roofing and electrical, so the job does not get handed between companies.

Local to Encino

Based in Northridge, we know LADWP permitting and net metering inside out.

Proven track record

11+ installs in Encino and work across Southern California since 2017.

Solar in Encino — FAQ

Does Cali Energy install solar in Encino?
Yes. We've completed 11+ solar projects across Encino, from compact rooftops to larger systems. Our office is in Northridge and we are the licensed contractor of record on every install.
Is net metering in Encino different from SCE areas?
Encino is served by LADWP, which isn't under the CPUC's NEM 3.0 tariff, so net-metering terms stay more favorable than in neighboring SCE cities — better economics for going solar.
Can you install on tile and shingle roofs in Encino?
Yes. We hold a C-39 roofing license and install on tile, composition-shingle and flat roofs in-house, including any roof repair or replacement the project needs.
How long does a solar install take in Encino?
The on-roof installation is typically completed in a day once permits are approved. LADWP issues Permission to Operate (PTO) after the final inspection, and the system goes live.
How much does solar cost in Encino?
The price depends on your roof, system size and how much power you use, and we offer financing options. The fastest way to a real number is a free, no-obligation on-site estimate.
Can I add a battery or backup power in Encino?
Yes. We install battery storage such as Tesla Powerwall and Enphase IQ Batteries alongside solar, so your home keeps power during outages and stores daytime production for the evening.

Nearby areas we serve

More areas we serve across Southern California

Cali Energy · 19201 Parthenia St, Unit E, Northridge, CA 91324 · CSLB #1032379 (B, C-10, C-39)