




12.3 kW on a tile roof — Encino
A 12.3 kW system on a tile roof in Encino — 30 panels, Enphase IQ8A, ~18,600 kWh/year. Installed 2025. Clean, low-profile panel layout that follows the roof lines.
Cali Energy is a local, full-stack-licensed solar installer and battery-storage company serving Encino — part of the City of Los Angeles served by LADWP. Because LADWP isn't on the CPUC's NEM 3.0 tariff, net metering in Encino stays more favorable than in neighboring SCE areas, so paybacks remain strong. We're based in Northridge and do every step in-house — solar panels, battery backup, roofing and electrical — under one CSLB license (#1032379: B, C-10, C-39). Below are real Encino installs, from a 4.8 kW rooftop to a 12.3 kW system.
Get a free Encino solar estimate11 projects completed across Encino — a few of them below.





A 12.3 kW system on a tile roof in Encino — 30 panels, Enphase IQ8A, ~18,600 kWh/year. Installed 2025. Clean, low-profile panel layout that follows the roof lines.




A 10.5 kW system on a composition shingle roof in Encino — 28 Q CELLS Q.PEAK DUO BLK G6 panels, Enphase IQ7 microinverters. Installed 2022. Sized to cover most of the home's annual electricity use.





A 7.9 kW system on a composition shingle roof in Encino. Sized for the home's full daytime usage.





A 7.74 kW system on a composition shingle roof in Encino — Enphase IQ8A. North-facing modules were reverse-tilted for extra output.



A 7.7 kW system in Encino. Installed 2021. Included a new main service panel.



A 4.8 kW system on a composition shingle roof in Encino. Installed 2021. Designed for daily bill offset and long-term energy savings.



A rooftop solar system on a composition shingle roof in Encino. Completed end-to-end by our in-house crew.
Twelve Encino case studies go further than the photographs above — what the roof was, what the service took, how the permit and the interconnection actually ran, and what happened after the system was switched on.
Encino housing runs from mid-century homes, with a median build year of 1956 across the 10,275 single-family homes in ZIP codes 91316 and 91436, to new construction, and Cali Energy has put solar on both. On one new Encino house the handover package included a map tying every microinverter's serial number to its position on the roof, delivered the day after the final in June 2022.
LADWP's meter spot sheet can set conditions for the service equipment itself. On a 2018 Encino job it called for a 22,000-amp interrupt rating at the service, a clear and level working space in front of it and three feet between the electrical and the gas; we checked the equipment against all three, and the system was switched on in January 2019.
Main panel upgrades in Encino →One of the eight systems we monitor in Encino's ZIP codes runs with a battery. On our Encino battery project the battery is mounted six inches from the interconnect device it feeds, well inside the five-foot distance at which the electrical code asks for extra overcurrent protection, and the reviewer approved the plans the afternoon that distance was confirmed; the house has had backup since May 2022.
Home batteries in Encino →Eight systems in Encino's ZIP codes report to our monitoring, three of them for more than five years. On a new Encino house whose array went up during construction, the optimizers stayed dark when the power was first turned on in February 2023; we established communication at the array the next morning, and the system was producing two days later.
Solar repair: how we do it →On a 2019 Encino re-roof we filed the LADWP application first, so the utility review was already moving when both permits, roofing and solar, came through on one day, and the house had permission to operate twenty-eight days after the application. Two years later, on another Encino house, twenty squares of Class A shingle went on before the array, which was switched on in November 2021.
Roofing in Encino →One licensed contractor covers solar, battery, roofing and electrical, so the job does not get handed between companies.
Based in Northridge, we know LADWP permitting and net metering inside out.
11+ installs in Encino and work across Southern California since 2017.
Cali Energy · 19201 Parthenia St, Unit E, Northridge, CA 91324 · CSLB #1032379 (B, C-10, C-39)