9.75 kW on a tile roof — Tarzana
A 9.75 kW system on a tile roof in Tarzana. Installed 2024. Fully permitted through LADWP with Permission to Operate granted in April 2024.
Cali Energy is a local, full-stack-licensed solar installer and battery-storage company serving Tarzana — part of the City of Los Angeles served by LADWP. Because LADWP isn't on the CPUC's NEM 3.0 tariff, net metering in Tarzana stays more favorable than in neighboring SCE areas, so paybacks remain strong. We're based in Northridge and do every step in-house — solar panels, battery backup, roofing and electrical — under one CSLB license (#1032379: B, C-10, C-39). Below are real Tarzana installs, from a 2.61 kW rooftop to a 9.75 kW system.
Get a free Tarzana solar estimate9 projects completed across Tarzana — a few of them below.





A 9.75 kW system on a tile roof in Tarzana. Installed 2024. Fully permitted through LADWP with Permission to Operate granted in April 2024.


A 8.9 kW system on a tile roof in Tarzana. Installed 2023. Interconnected and granted LADWP Permission to Operate in about a month.





A 2.61 kW system on a composition shingle roof in Tarzana. Installed 2025. Taken from LADWP interconnection request to Permission to Operate in 2025.





A rooftop solar system on a composition shingle roof in Tarzana. Installed 2025. A straightforward residential install in Tarzana, handled end to end.




A rooftop solar system on a composition shingle roof in Tarzana — SolarEdge HD-Wave. Installed 2022. Installed with a utility meter panel upgrade.





A rooftop solar system on a tile roof in Tarzana. Designed for daily bill offset and long-term energy savings.



A rooftop solar system in Tarzana — Enphase microinverters. Installed 2021. A 13.3 kW system — one of our largest LADWP residential installs in Tarzana, on Enphase microinverters.
Nine Tarzana case studies go further than the photographs above — what the roof was, what the service took, how the permit and the interconnection actually ran, and what happened after the system was switched on.
One licensed contractor covers solar, battery, roofing and electrical, so the job does not get handed between companies.
Based in Northridge, we know LADWP permitting and net metering inside out.
9+ installs in Tarzana and work across Southern California since 2017.
Cali Energy · 19201 Parthenia St, Unit E, Northridge, CA 91324 · CSLB #1032379 (B, C-10, C-39)