

11.89 kW rooftop solar — Sun Valley
A 11.89 kW system on a composition shingle roof in Sun Valley — 33 Q CELLS panels, Enphase IQ7+. Installed 2022. LADWP granted Permission to Operate on this 11.89 kW solar system in August 2022.
Cali Energy is a local, full-stack-licensed solar installer and battery-storage company serving Sun Valley — part of the City of Los Angeles served by LADWP. Because LADWP isn't on the CPUC's NEM 3.0 tariff, net metering in Sun Valley stays more favorable than in neighboring SCE areas, so paybacks remain strong. We're based in Northridge and do every step in-house — solar panels, battery backup, roofing and electrical — under one CSLB license (#1032379: B, C-10, C-39). Below are real Sun Valley installs, from a 1.74 kW rooftop to a 11.89 kW system.
Get a free Sun Valley solar estimate8 projects completed across Sun Valley — a few of them below.


A 11.89 kW system on a composition shingle roof in Sun Valley — 33 Q CELLS panels, Enphase IQ7+. Installed 2022. LADWP granted Permission to Operate on this 11.89 kW solar system in August 2022.





A 6.12 kW system on a composition shingle roof in Sun Valley — 18 Q CELLS Q.PEAK DUO panels, Enphase IQ7+. Installed 2022. 6.12 kW rooftop solar with 18 Q CELLS panels and Enphase microinverters in Sun Valley.


A 5.44 kW system in Sun Valley — 16 Q CELLS Q.PEAK DUO panels, Enphase IQ7+. Installed 2022. 16 Q CELLS 340W panels paired with Enphase IQ7+ microinverters for 5.44 kW.



A 2.32 kW system on a composition shingle roof in Sun Valley. Installed 2023. LADWP granted Permission to Operate this 2.32 kW solar system in November 2023.



A 1.74 kW system on a composition shingle roof in Sun Valley. Installed 2023. A compact 1.74 kW solar system for a new Sun Valley ADU, granted LADWP Permission to Operate in 2023.



A rooftop solar system on a composition shingle roof in Sun Valley. Designed for daily bill offset and long-term energy savings.




A rooftop solar system on a composition shingle roof in Sun Valley. Permitted, installed and taken through to PTO by Cali Energy.
One licensed contractor covers solar, battery, roofing and electrical, so the job does not get handed between companies.
Based in Northridge, we know LADWP permitting and net metering inside out.
8+ installs in Sun Valley and work across Southern California since 2017.
Cali Energy · 19201 Parthenia St, Unit E, Northridge, CA 91324 · CSLB #1032379 (B, C-10, C-39)