Encino · LADBS

Roofing in Encino, CA: re-roofs that carry the solar after them

Cali Energy replaces and repairs roofs in Encino under its C-39 roofing license. On two Encino houses twenty and thirty squares of Class A composition shingle went on before the array, on a third the roofing and solar permits were issued the same day, and on a fourth a concrete tile roof took a 12.3 kW array with the tile reset over every mount.

Encino's single-family homes have a median build year of 1956, and LADBS issued 286 re-roof permits on one- and two-family homes here from January 2025 to May 2026. A re-roof in Encino falls under the City of Los Angeles cool-roof rule, and when solar is planned, the order decides what the next twenty years cost: the roof first under its own permit, then the array. Cali Energy has run the roof and the solar together on three Encino houses, and each system went into service on its new roof.

Black solar modules across several planes of a composition shingle hip roof in Encino, with trees and neighboring roofs beyond
Twenty-eight Q CELLS modules spread across the planes of a hip roof — 9.52 kilowatts. The covering under them went on six weeks before the array.

Encino roofs

  • Mid-century houses. Median build year 1956; 60.1% of Encino's 10,275 single-family homes were built before 1960.
  • Re-roofs are routine here. LADBS issued 286 re-roof permits on one- and two-family homes in Encino from January 2025 to May 2026. How often LA roofs get replaced
  • Shingle and tile. Our Encino jobs run from Class A composition shingle on single-story hip roofs to concrete S-tile.
  • The cool-roof rule. Encino is in the City of Los Angeles, so a full re-roof needs a covering rated by the Cool Roof Rating Council. The cool-roof rule

Roof first, then the array

Modules last decades; a shingle covering with a few years left does not. Putting an array on it means paying later to take the modules off, re-roof, and put them back with new flashings at every mount. On our 2021 Encino project the roofing permit was issued on 16 September, the material was ordered the next day, and the interconnection application went in only once the new covering was on; the net meter was set on 10 November. On another Encino house thirty squares went on in December and the array followed in January. Solar removal and reinstallation

Two permits, one contract

Roofing and solar travel on separate permits with separate inspections. Run under one contractor, they do not have to add up in sequence: on our 2019 Encino project the interconnection application was filed first, the roofing and solar permits were issued on the same day, and permission to operate came twenty-eight days after the application, on 30 December.

Tile under an array

Concrete tile is brittle once it has aged, and every mount on a tile roof means a tile lifted, a flashed bracket fixed to the rafter, and the tile set back. On our 2025 Encino tile project the estimate carried 150 replacement tiles as a line of its own from the start, and after start-up we walked both planes and secured the tile on the lower roof. Tile roof repair

Encino roofs we have worked on

Solar modules on two planes of a new composition shingle roof, routed around a rooftop air conditioning unit, Encino
Encino, CA · September 2021 – November 2021 · LADWP / LADBS

The roof went on first, and that was the whole decision.

Twenty squares of Class A composition shingle over the existing sheathing, roofing permit first; the array followed and permission to operate came on 10 November 2021.

Solar modules along the ridge of a shingle roof with a rooftop air conditioning unit beyond, Encino
Encino, CA · December 2021 – February 2022 · LADWP / LADBS

Same modules, same roof, different plan set.

Thirty squares of Class A composition shingle under a December roofing permit; the array went on in January and passed its final on the first visit.

First modules being set on the rails of a tile roof, with flashing visible at a mount point, Encino
Encino, CA · May 2025 – August 2026 · LADWP / LADBS

Thirty modules on concrete tile, and what tile costs.

A concrete S-tile roof under a 12.3 kW array: 150 replacement tiles priced in from the first estimate, tile reset over flashed mounts, both planes walked after start-up.

How a roofing job runs in Encino

  1. Inspection. The covering, the deck where it can be seen, flashings at every penetration, and the attic ventilation.
  2. Written scope. Squares, underlayment, flashings, vents and the decking terms, line by line.
  3. LADBS roofing permit, with the solar permit alongside it when an array is planned.
  4. Tear-off and new roof under our C-39 license, with the cool-roof covering the city requires.
  5. Inspection and final, then the array on new flashed attachments when solar is part of the job.

Nearby. Roofing in Woodland Hills · North Hollywood · Northridge · All our Encino projects

Roofing questions for Encino

Does Cali Energy do roofing in Encino?

Yes. Cali Energy replaces and repairs roofs in Encino under its C-39 roofing license, with the LADBS permit and inspections. On three Encino houses the roofing went in with the solar under one contract, and on a fourth we worked a concrete tile roof under a new array. CSLB #1032379, based in Northridge; call +1-323-844-7777.

Should I re-roof before adding solar in Encino?

When the covering has less life left than the array, yes: the roof goes on first under its own permit and the array follows on new flashed attachments. On two of our Encino projects the new shingle went on first and the array followed within weeks.

How long do a roof and solar take together in Encino?

On our 2019 Encino project, with both permits issued the same day, permission to operate came twenty-eight days after the interconnection application. On our 2021 project the roofing permit was issued on 16 September and the net meter was set on 10 November.

Can solar go on my Encino tile roof?

Yes. Each mount is fixed to a rafter through a flashing and the tile is set back over it; on our 2025 Encino tile project the replacement tile was priced into the estimate from the start, and both planes were walked after start-up.

Get your Encino roof scoped

Tell us the roof's age, the covering and whether solar is on it or planned. We will measure it, check the deck, and give you a written scope with the shingle or tile work, the flashings and the permit.

Get an Encino roofing quote Call +1-323-844-7777

CSLB #1032379 · B, C-10, C-39