Tujunga, Los Angeles, CA · February – March 2024 · LADWP / LADBS
A house and an ADU: two permits, two meters, two finals
Fifteen modules on the house and three on the ADU, installed the same day. Each building had its own permit and its own meter, so each went through its own final.
This Tujunga lot has solar on both the main house and its ADU: fifteen LA Solar 450 W modules on the house and three on the ADU, each with an Enphase IQ8M microinverter, 6.75 and 1.35 kW DC. Each building had its own LADBS permit, its own meter and its own final. Cali Energy installed both systems on 16 February 2024; both finals were passed on 5 March 2024, and LADBS approved the service release for both.
At a glance
- Main house
- 15 × LA Solar LS450BL, 450 W — 6.75 kW DC
- ADU
- 3 × LA Solar LS450BL, 450 W — 1.35 kW DC
- Microinverters
- Enphase IQ8M, one per module
- Permits and meters
- One of each per building
- Installed
- 16 February 2024, both systems
- Finals passed
- 5 March 2024, both permits
The story
There are two homes on this lot, the main house and an ADU, and each has its own address. That decides the paperwork: two LADBS permits, issued the same day in February 2024, one per building, and at the service two meters side by side, one per home. How solar works for a second home on a lot is set out in solar for an ADU in Los Angeles.
The installation was booked for Thursday 15 February and moved to Friday the 16th so the materials could arrive first. Both systems went in that day: fifteen LA Solar 450 W modules on the house and three on the ADU, every module with an Enphase IQ8M microinverter under it.
Each system carries its own placard at the service with its own figures: 20.25 amps maximum for the house and 4.05 for the ADU, fifteen and three microinverters at 1.35 amps each.
Both finals were requested for 28 February. LADBS issued a correction on each, and the crew was back on site the next morning. The new finals were set for Tuesday 5 March. For them, the inspector would check the breakers directly, including one in the subpanel inside the ADU, so access to the ADU was arranged with the homeowner, and the system paperwork, kept inside the gateway enclosure, was to be set out where the inspector could see it.
On 5 March both finals were passed, and LADBS approved the electrical service release for both permits the same day.
How it ran
| 13 February 2024 | Two LADBS permits issued, one per building |
|---|---|
| 16 February 2024 | Both systems installed |
| 28 February 2024 | First finals: a correction on each permit |
| 29 February 2024 | Crew back on site |
| 5 March 2024 | Both finals passed; service release approved for both |
Two buildings, two permits, and the finals walked together.
What we did
- Installed both systems, house and ADU, on the same day.
- Mounted every module on flashed L-feet with an IQ8M under each.
- Labeled each system at the service with its own figures.
- Returned to the site the morning after the first finals.
- Arranged ADU access and visible paperwork for the second finals.
System specifications
| Modules | 18 × LA Solar LS450BL, 450 W (15 + 3) |
|---|---|
| System sizes | 6.75 kW DC house, 1.35 kW DC ADU |
| Microinverters | Enphase IQ8M, one per module |
| Meters | Two, one per home |
| ADU | Subpanel inside the building |
| Utility / AHJ | LADWP / LADBS |
Is your project like this one?
- You have a house and an ADU on one lot.
- Your ADU has its own address or its own meter.
- You want solar on both buildings.
- Your final inspection came back with a correction.
- You live in Tujunga or Sunland.
Cali Energy in Tujunga
Tujunga is a neighborhood inside the City of Los Angeles: permits run through LADBS, interconnection through LADWP.
Tujunga is inside the City of Los Angeles, and on lots with a house and an ADU each building can carry its own address. When it does, each has its own LADBS permit, its own meter and its own final inspection.
- License and classifications: CSLB #1032379
- Official reference for this process: LADBS — inspections
- Official reference for this process: LADWP interconnection requirements
Frequently asked questions
Why did this Tujunga house and ADU need two permits?
Because each building has its own address on this lot. Each got its own LADBS permit, its own meter at the service and its own final inspection, and both permits were issued on the same day in February 2024.
What did the inspector check on the second final?
The inspector would check the breakers directly, including one in the subpanel inside the ADU, so access to the ADU was arranged with the homeowner, and the system paperwork was to be set out where the inspector could see it. Both finals were passed that day.
How big are the two systems?
The main house has fifteen LA Solar LS450BL modules rated 450 W, 6.75 kW DC, and the ADU has three, 1.35 kW DC. Every module has an Enphase IQ8M microinverter under it, and each system has its own placard at the service.
Does Cali Energy install solar on ADUs in Tujunga?
Yes. Tujunga is inside the City of Los Angeles, so permits run through LADBS and interconnection through LADWP. Cali Energy installs on main houses and ADUs here, including lots where each building has its own permit and meter. License CSLB #1032379.
What this would look like on your roof
Planning solar in Tujunga? Tell us your utility, your roof and what your bill looks like now, and we will model what a system like this would do on your house before you commit to anything.
Or call +1 (323) 844-7777 · Cali Energy, Northridge · CSLB #1032379 (B, C-10, C-39) — design, permits, install and electrical under one licensed contractor.