Does a New ADU in Los Angeles Need Solar?
Straight answer: only a new detached ADU has to have solar, and not much of it. Under the 2025 California Energy Code, in effect since January 1, 2026, the required system tops out around 2.1 kW for a 1,200-square-foot unit in Los Angeles — and a unit under about 718 sq ft in the San Fernando Valley’s climate zone, or about 960 sq ft on the coast, needs none. Attached ADUs and conversions have no solar requirement. The panels can go anywhere on the lot, including added to the main house’s system.
Get a free estimate
- A new detached ADU is a newly constructed building under the Energy Code and needs newly installed PV sized by Equation 150.1-C, unless an exception applies.
- In Los Angeles that means at most about 2.1 kW for a 1,200 sq ft unit. Below 1.8 kW no PV is required — under about 718 sq ft in climate zone 9, about 960 sq ft in zone 6.
- Attached ADUs and garage conversions are additions; converting existing living space or a junior ADU is an alteration. Neither carries the PV requirement.
- The PV can go anywhere on the lot and can be added to the main house’s existing system, but it must be new modules; a qualifying battery cuts the required size by 25%.
- A separate ADU meter changes the credits: LADWP nets each account over its billing period; SCE credits exports under the Net Billing Tariff.
Which ADUs need solar
The California Energy Commission’s answer is short: “an ADU is considered a newly constructed building if it is a new, detached structure,” and a newly constructed detached ADU needs newly installed solar PV under Section 150.1(c)14 unless an exception applies. Attached ADUs, and conversions of unconditioned space such as a garage or storage room into living space, are additions under Section 150.2(a); solar PV is not required for them. Turning existing conditioned space — a basement or pool house — into an ADU or a junior ADU (up to 500 sq ft inside the house) is an alteration (CEC, 2025 Energy Code ADU FAQs).
The 2025 code applies to building permit applications filed from January 1, 2026 (California Building Standards Commission); an ADU that applied earlier stays under the 2022 code, whose PV formula and coefficients for the Los Angeles climate zones are the same.
| Project | Energy Code treatment | Solar PV required? |
|---|---|---|
| New detached ADU | Newly constructed building (150.1(c)14) | Yes, sized by Equation 150.1-C, unless an exception applies |
| New attached ADU | Addition (150.2(a)) | No |
| Garage or storage conversion to living space | Addition (150.2(a)) | No |
| Conversion of existing living space; junior ADU | Alteration (150.2(b)) | No |
| Factory-built (modular) detached ADU | Must comply with Title 24, including the Energy Code | Yes, as for a site-built unit |
| HUD-labeled manufactured home | Title 25 rules instead | Not under the Energy Code |
Source: California Energy Commission — 2025 Energy Code ADU FAQs. LADBS and your Title 24 analyst confirm how your project is classified.
How much solar the code requires
The minimum comes from Equation 150.1-C: kW = (conditioned floor area × A) ÷ 1000 + (dwelling units × B), with A and B set by climate zone in Table 150.1-C. For a detached ADU there is one dwelling unit. Los Angeles spans several zones: in the Energy Commission’s ZIP-code list, San Fernando Valley and central ZIP codes such as 91324, 91406 and 90012 are zone 9; coastal ones such as 90049, 90291 and 90731 are zone 6; 90001 and 90044 are zone 8; and 91042 is zone 16 (CEC climate zones by ZIP).
| Climate zone | No PV below | 600 sq ft | 800 sq ft | 1,000 sq ft | 1,200 sq ft |
|---|---|---|---|---|---|
| Zone 9 (A 0.613, B 1.36) | 718 sq ft | 1.73 kW · exempt | 1.85 kW | 1.97 kW | 2.10 kW |
| Zone 8 (A 0.586, B 1.37) | 734 sq ft | 1.72 kW · exempt | 1.84 kW | 1.96 kW | 2.07 kW |
| Zone 6 (A 0.594, B 1.23) | 960 sq ft | 1.59 kW · exempt | 1.71 kW · exempt | 1.82 kW | 1.94 kW |
| Zone 16 (A 0.59, B 1.22) | 983 sq ft | 1.57 kW · exempt | 1.69 kW · exempt | 1.81 kW | 1.93 kW |
Cali Energy calculation from Equation 150.1-C and Table 150.1-C (2025 Building Energy Efficiency Standards). “Exempt” = under 1.8 kWdc (Exception 2). Your CF1R compliance form sets the actual number.
A required 2 kW is about five 400-watt panels. Three more rules shape the number: the requirement cannot exceed what fits the solar access roof area — unshaded roof able to carry PV, measured on the ADU and any other new structures on the site — and no PV is required if that area is under 80 contiguous square feet; north-facing steep roof areas are left out; and pairing the PV with a battery that has at least 7.5 kWh of cycling capacity under Joint Appendix JA12 allows a 25% smaller array (Section 150.1(c)14, Exceptions 1, 2 and 5).
Does your ADU need solar? Quick check
Pick the project type, size and climate zone. The tool applies the code formula and exceptions; your Title 24 analyst’s compliance documents are the final word.
ADU solar requirement check
Does your ADU need solar under the 2025 Energy Code, and how much?
Equation 150.1-C and Table 150.1-C of the 2025 Energy Code; climate zones from the CEC’s ZIP-code list — check your address with the CEC climate zone tool. The roof-area cap and other exceptions are applied in your Title 24 compliance documents.
Where the panels can go
“The 2025 Energy Code does not specify where new solar PV modules must be installed,” the Energy Commission says: they must be on the same residential lot and meet the utility’s requirements. Two rules follow from its FAQ. An existing solar system on the main house cannot count toward a new detached ADU’s requirement — the PV must be newly installed. But new modules can be added to that existing system, and even an ADU on a separate meter can meet the requirement with modules added to the main house’s system that do not serve the ADU (CEC ADU FAQs). That lets the panels go on whichever roof on the lot has the best sun.
Other 2025 requirements for a new ADU
Two more Energy Code rules come with a new ADU. It must be battery-ready under Section 150.0(s) unless its electric service is 125 amps or less, and an installed battery system with all its wiring satisfies the rule. A new detached ADU that installs gas water heating, space heating, a gas cooktop or dryer must also meet the electric-ready requirements, so the wiring for a later switch is in place (CEC ADU FAQs).
One meter or two — and what it does to the credits
| Setup | How it works | Effect on solar credits |
|---|---|---|
| Shared meter | The ADU runs on the main house’s service; one bill for the property | The whole property nets together; the solar offsets the combined use |
| Separate meter | The ADU gets its own service, meter and account | Each account nets on its own; panels on one meter do not offset the other account |
LADWP. The utility handles meter-spot requests for single-family homes and ADUs with services up to 320 amps as a free service (LADWP). Its solar credits follow its own rules, not NEM 3.0: exported and imported kilowatt-hours net over each billing period, usually two months, and any excess becomes a credit that never expires but is never paid out (LADWP; see LADWP net metering). For interconnection, a system up to 30 kW without a service panel upgrade or multiple meters is Type 1; one with a service panel upgrade or a multi-meter interconnection goes through Type 2 (LADWP).
SCE. New systems are on the Net Billing Tariff, where exports earn hourly values — for customers who start in 2026 about 3¢ to 21¢ per kWh by season and hour (SCE) — well below what the account pays for imports. Size for use on the same meter and consider a battery; see NEM 3.0 explained.
Permits: it still runs through LADBS
In the City of Los Angeles every PV system needs an LADBS electrical permit (LADBS). For a new detached ADU the required PV is part of the unit’s Title 24 compliance documents submitted with the building permit; a subpanel, a service change or a separate meter adds electrical work of its own. Whether the property needs a panel or service upgrade is a load calculation — see do you need a main panel upgrade — and the local process is in solar permits in Los Angeles.
Roof, electrical and solar under one license
A new ADU often needs roofing, electrical work for a subpanel or service, and the required solar. Cali Energy holds general building (B), electrical (C-10) and roofing (C-39) classifications under CSLB #1032379, so those three pieces can be planned together. See nearby work on our Los Angeles projects page, and for system prices, our LA solar cost guide.
Bottom line: if you are building a new detached ADU, check its size against the table first — a small unit may need no solar at all, and a larger one about 2 kW, which can join the main house’s system. Decide the meter setup early, because it decides how the credits work. Attached units and conversions carry no solar requirement, though solar can still pay on its own. LADBS, your utility and a Title 24 analyst confirm the details for your address.
Get a straight answer for your ADUFrequently asked
Does a new ADU in Los Angeles have to have solar panels?
Only a new detached ADU, and only if its required size reaches 1.8 kWdc. The California Energy Commission treats a new detached ADU as a newly constructed building under Section 150.1(c)14; attached ADUs and garage conversions are additions, and conversions of living space and junior ADUs are alterations, with no PV requirement.
How big does the solar system on a new ADU have to be?
Equation 150.1-C sets it from the conditioned floor area and climate zone. In Los Angeles a detached ADU of up to 1,200 sq ft needs at most about 2.1 kW — roughly five 400-watt panels. Below 1.8 kW no PV is required: under about 718 sq ft in climate zone 9 and about 960 sq ft in zone 6.
Does a garage conversion ADU need solar?
No. Converting a garage or storage space into living space is an addition under Section 150.2(a), and the Energy Commission says solar PV is not required for additions. Other addition requirements, such as insulation and equipment rules, still apply.
Can the ADU's solar go on the main house or join its existing system?
Yes. The Energy Code does not specify where the new modules go, as long as they are on the same lot and meet the utility’s requirements, and new modules can be added to the main house’s existing system — even when the ADU has its own meter. The existing panels themselves cannot count; the PV must be newly installed.
Can a battery reduce the ADU solar requirement?
Yes. Exception 5 to Section 150.1(c)14 allows a 25% smaller PV system when it is installed with a battery that meets Joint Appendix JA12 and has at least 7.5 kWh of cycling capacity.
Does a prefab ADU need solar?
A factory-built (modular) ADU must comply with Title 24, including the Energy Code, so a new detached one is treated like a site-built unit. A HUD-labeled manufactured home follows Title 25 rules instead.
Does my ADU need its own electric meter?
Not necessarily; it can share the main house’s service or get its own. The choice changes the credits: with one meter the property nets together, with two each account nets on its own. LADWP handles meter-spot requests for homes and ADUs up to 320 amps free, and routes multi-meter solar interconnections through its Type 2 process.
Related reading
Sources & methodology
Figures on this page come from the primary sources below and, where noted, from Cali Energy calculations using the stated assumptions. Rates, incentives, and program terms change; each was verified September 30, 2026.
- California Energy Commission — 2025 Building Energy Efficiency Standards (CEC-400-2025-010-F): Section 150.1(c)14, Equation 150.1-C, Table 150.1-C
- California Energy Commission — 2025 Energy Code ADU FAQs (Energy Code Support Center)
- California Energy Commission — Building climate zones by ZIP code
- California Energy Commission — Climate zone tool and maps
- California Building Standards Commission — 2025 Title 24 code changes (effective January 1, 2026)
- LADWP — Type 1, 2 and 3 interconnection
- LADWP — Request a meter spot for a single-family home or ADU up to 320 amps
- LADWP — Service Rider NEM, Net Energy Metering
- SCE — Solar Billing Plan (Energy Export Credit values)
- LADBS — Information Bulletin P/GI 2023-027, Solar Energy Systems
Planning an ADU in Los Angeles?
Tell us your ADU plans and address, and we'll tell you whether Title 24 requires solar, how much, how it should be metered, and what it costs — roof, electrical and panels under one LA license. Call +1-323-844-7777.
Get a free estimatePrepared by Cali Energy, September 30, 2026. This article is for general educational purposes only and is not legal, tax, financial, engineering, or utility advice. Rates, incentives, codes, permit requirements, equipment specifications, prices, and program terms may change; figures and timelines are estimates, not guarantees. Confirm current requirements with the applicable utility, AHJ, program administrator, manufacturer, or a licensed professional. See our Content Disclaimer. Cali Energy · 19201 Parthenia St, Unit E, Northridge, CA 91324 · CSLB #1032379 (B, C-10, C-39)