Tujunga, Los Angeles, CA · August – September 2022 · LADWP / LADBS

Modules on tilt legs over a flat roof, and a main breaker de-rated to 175 A

A mostly low-slope roof with skylights and a rooftop air conditioner, modules raised and angled on tilt legs, and a main breaker de-rated from 200 to 175 amps to connect them to the existing panel.

Cali Energy installed this Tujunga system on tilt legs over a low-slope roof, with a SolarEdge HD-Wave inverter on the wall. To connect it to the existing panel, the main breaker was de-rated from 200 to 175 amps. The installation was in the last week of August 2022, the final inspection was set for 31 August, and LADWP set the new meter at the end of September.

Solar modules on tilt legs over a low-slope roof, with trees and flowering shrubs beyond, Tujunga
Modules on tilt legs over the low-slope roof.

At a glance

Roof
Low-slope, with a shingle section
Mounting
Tilt legs on round bases
Inverter
SolarEdge HD-Wave
Main breaker
De-rated from 200 A to 175 A
Final inspection
Set for 31 August 2022
New meter
Set by LADWP at the end of September 2022

The story

Most of this roof is low-slope, with a smaller shingle section, skylights and an air conditioner on top. On a low-slope roof the modules do not lie flat: here they sit on tilt legs, raised off the roof and angled toward the sun, each leg standing on a round base on the roof.

A second group of solar modules on tilt legs over a low-slope roof, with skylights and a satellite dish, Tujunga
The second group on tilt legs, between the skylights.

The electrical side had one condition. The main breaker was 200 amps, and to take the solar breaker it was de-rated to 175 amps, so the panel's busbar stays within its rating with solar feeding it too. Whether a de-rate is enough or a panel upgrade is needed depends on each house, and it is a call for a licensed electrician.

A low-slope roof with solar modules and a pitched shingle section, with foothills on the horizon, Tujunga
The low-slope roof and the shingle section, with the foothills beyond.

The installation was set for Wednesday 24 August. The final inspection was set for 31 August.

A SolarEdge HD-Wave inverter on a white stucco wall next to the electrical service, Tujunga
The SolarEdge HD-Wave inverter beside the service.

At the end of September LADWP set the new meter at the house.

How it ran

Mid-August 2022Project scheduled; main breaker de-rate to 175 A planned
Late August 2022Array installed on tilt legs
31 August 2022Final inspection set
End of September 2022LADWP sets the new meter

From the scheduled install to a new meter in about five weeks.

What we did

  • Set the modules on tilt legs over the low-slope roof.
  • Mounted the SolarEdge HD-Wave inverter beside the service.
  • De-rated the main breaker from 200 A to 175 A for the solar connection.

System specifications

MountingTilt legs on round bases, low-slope roof
InverterSolarEdge HD-Wave
Module electronicsSolarEdge optimizers
Main breaker200 A de-rated to 175 A
Utility / AHJLADWP / LADBS

Is your project like this one?

  • Your roof is low-slope, or part low-slope and part shingle.
  • You have skylights or equipment on the roof.
  • You have been told your main breaker needs to be de-rated.
  • You live in Tujunga or the foothill neighborhoods around it.

Cali Energy in Tujunga

Tujunga is a neighborhood inside the City of Los Angeles: permits run through LADBS, interconnection through LADWP.

Tujunga's hillside houses come in every roof type, and a good number have low-slope roofs, alone or beside a pitched shingle section. Tujunga is inside the City of Los Angeles, so the permits are LADBS permits and the grid is LADWP's.

Frequently asked questions

How were the modules mounted on this Tujunga flat roof?

On tilt legs. The modules are raised off the low-slope roof and angled toward the sun, and each leg stands on a round base on the roof surface. The groups sit between the skylights and the rooftop air conditioner.

Why was the main breaker de-rated to 175 amps?

On this house the main breaker was 200 amps, and de-rating it to 175 amps let the solar breaker go into the existing panel while keeping the busbar within its rating. Whether that works for a given house depends on its loads and panel.

Does Cali Energy install solar on flat roofs in Tujunga?

Yes. Tujunga is inside the City of Los Angeles, with permits through LADBS and interconnection through LADWP. Cali Energy installs here on low-slope roofs as well as shingle, including systems on tilt legs. License CSLB #1032379.

What this would look like on your roof

Planning solar in Tujunga? Tell us your utility, your roof and what your bill looks like now, and we will model what a system like this would do on your house before you commit to anything.

Or call +1 (323) 844-7777 · Cali Energy, Northridge · CSLB #1032379 (B, C-10, C-39) — design, permits, install and electrical under one licensed contractor.

Related

Updated October 2026.