Sunland, Los Angeles, CA · October 2025 · LADWP / LADBS

How we mounted eleven panels on a Sunland shingle roof

Eleven 440 W modules on one shingle face. Each mount is a standoff: sealed fasteners, and a conical flashing tucked under the shingle course above.

This Sunland installation is 4.84 kW DC: eleven HD Hyundai 440 W modules, each with an Enphase IQ8MC microinverter, in a single group on a shingle roof. Cali Energy mounted it on standoffs. Each one combines sealed fasteners with a conical flashing tucked beneath the upper shingle course, and the rails bolt to the tops of the posts. The array was installed in one day in October 2025.

Black solar modules on a gray shingle roof at sunset with foothills behind, Sunland
The finished array, with the foothills behind.

At a glance

System
4.84 kW DC
Modules
11 × HD Hyundai HiS-T440NF(BK), 440 W
Microinverters
Enphase IQ8MC, one per module
Mounts
Standoffs on conical flashings
Roof
Composition shingle

The story

Each standoff on this roof combines sealed fasteners with a conical flashing tucked beneath the upper shingle course. A standoff is a short aluminum post bolted down through the roof; the rails bolt to the tops of the posts, above the shingles.

Sealant filling two bolt holes in a shingle roof before a standoff base is set, Sunland
Sealant in the bolt holes, before the base goes down.

Every standoff went in the same way. The shingle where the base sits was opened, the bolt holes were drilled and filled with sealant, and the base was bolted down. Then the conical flashing went over the post and up under the shingle course above it, so water running down the roof passes over the cone rather than into the holes.

A standoff post rising from a conical metal flashing tucked under the shingles, Sunland
A finished standoff: the cone tucked under the course above.

With the posts in, the rails went across them and the microinverters onto the rails, one at each module position, wired before any module covered them. Then came the eleven modules, 440 W each, for 4.84 kW DC in a single group.

Aluminum rails with Enphase microinverters on a shingle roof before the modules, a work truck below, Sunland
Rails and microinverters in place, before the modules went on.

From the array the circuit runs down to an Enphase combiner and an AC disconnect on the wall. On a shingle roof the part that decides how the array ages is the part nobody sees afterwards: what is under each of the cones.

How it ran

8 October 2025Standoffs set, each sealed and flashed
8 October 2025Rails and IQ8MC microinverters installed
8 October 2025Eleven modules on; circuit to the combiner and disconnect

Mounts, rails, modules and wiring, all in one day.

What we did

  • Measured out the layout on the roof.
  • Filled every bolt hole with sealant before the standoff bases went down.
  • Slid a conical flashing over each post and under the shingle course above.
  • Installed rails and an Enphase IQ8MC microinverter at each module position.
  • Installed the eleven modules and ran the circuit to the wall.

System specifications

Modules11 × HD Hyundai HiS-T440NF(BK), 440 W
System size4.84 kW DC, one group of 11
MicroinvertersEnphase IQ8MC, one per module
MountingStandoffs on conical flashings, rails on top
On the wallEnphase combiner and AC disconnect
Utility / AHJLADWP / LADBS

Is your project like this one?

  • You want to know how standoff mounts are sealed on a shingle roof.
  • You are planning a system of around five kilowatts.
  • You want a microinverter under every module.
  • You live in Sunland or the foothill neighborhoods around it.

Cali Energy in Sunland

Sunland is a neighborhood inside the City of Los Angeles: permits run through LADBS, interconnection through LADWP.

Sunland sits in the foothills of the San Gabriel Mountains, inside the City of Los Angeles. Many of its houses have composition shingle roofs, where every solar mount is a hole through the roof that has to be sealed and flashed.

Frequently asked questions

How were the standoff mounts sealed on this Sunland roof?

Each bolt hole was filled with sealant before the standoff base went down, and a conical flashing was slid over each post and up under the shingle course above it. The flashing sheds water running down the roof past the post, and the sealant fills the holes underneath.

What equipment is in this Sunland system?

Eleven HD Hyundai HiS-T440NF(BK) modules rated 440 W each, 4.84 kW DC in all, with an Enphase IQ8MC microinverter under every module, wired as a single group. The circuit runs down to an Enphase combiner and an AC disconnect on the wall.

Does Cali Energy install solar on shingle roofs in Sunland?

Yes. Sunland is inside the City of Los Angeles, with permits through LADBS and interconnection through LADWP. Cali Energy installs on shingle roofs here with sealed, flashed mounts and a microinverter under each module. License CSLB #1032379.

What this would look like on your roof

Planning solar in Sunland? Tell us your utility, your roof and what your bill looks like now, and we will model what a system like this would do on your house before you commit to anything.

Or call +1 (323) 844-7777 · Cali Energy, Northridge · CSLB #1032379 (B, C-10, C-39) — design, permits, install and electrical under one licensed contractor.

Related

Updated October 2026.