Do Homes With Solar Need a New Roof Sooner? Re-Roof Permits Before and After Solar on 11,106 LA Homes

No — but many replace the roof first. Of 11,106 homes in the City of Los Angeles that took out a solar permit between mid-2019 and May 2023, 10.7% also took out a re-roof permit within 90 days of it, most of them just before. After that, they re-roofed at about the same rate as comparable homes without solar: 1.3% a year in the three years after installation, against 1.4% a year for similar homes in the same ZIP codes.

Updated October 15, 2026 · Data through May 2026 · Cali Energy research team · CSLB #1032379 · verify license

10.7%
Solar homes that re-roofed within 90 days of the solar permit
6.5%
Re-roofed in the 90 days before going solar
1.3% / 1.4%
Re-roofs a year after installation: solar homes / similar homes without solar
11,106
Solar homes followed in LADBS permit records

A roof under solar panels is harder to replace: the array has to come off and go back on. That raises two questions homeowners ask before going solar — do panels wear a roof out faster, and how often does the array end up being removed for a new roof? Every re-roof and every solar installation in the City of Los Angeles needs a permit, and the city publishes them, so the records can answer both for thousands of homes.

Re-roof first6.5% of solar homes took out a re-roof permit in the 90 days before the solar permit, and 4.2% in the 90 days after.
Not sooner afterwardsIn the second and third years after installation, solar homes re-roofed at about 1.1% a year; similar homes without solar at 1.4%.
A quiet stretchHomes that re-roof with the solar job are unlikely to need another roof for many years, which keeps the later rate low.
R&R is a long-run costAt the measured rate, at least 13% of solar homes would replace the roof within 10 years and 24% within 20.

Re-roof permits around the solar permit

11,106 City of Los Angeles homes with a first solar permit from July 2019 to May 2023.

Share of solar homes re-roofing, per year, in each window around the solar permit
Re-roof rate around the solar permitRe-roofs spike in the 90 days around the solar permit and fall to about 1.3 percent a year afterwards.0%5%10%15%20%25%30%23 to 1 yr before41 yr to 90 d before2690 d before1790 d after290 d to 1 yr after11 to 2 yr after12 to 3 yr aftersimilar homes, 1.4%
Bars: share of homes with a re-roof permit in each window, converted to a yearly rate so windows of different length compare. Line: yearly re-roof rate of similar homes without solar in the same ZIP codes.
Re-roof permits before and after the solar permit
WindowHomes observedRe-roofedShareShare per year
3 to 1 years before4,8281703.5%1.8%
1 year to 90 days before10,0632993.0%3.9%
90 days before11,1067186.5%26.2%
90 days after11,1064704.2%17.2%
90 days to 1 year after11,1061881.7%2.2%
1 to 2 years after11,1061181.1%1.1%
2 to 3 years after11,0211161.1%1.1%
A window counts a home only when the whole window falls inside the permit data (January 2019 – May 2026), so the earliest windows cover fewer homes.
How to cite: Cali Energy, “Do Homes With Solar Need a New Roof Sooner?,” updated October 15, 2026, https://cali-energy.com/research/solar-homes-reroof-before-after-los-angeles. Aggregated data are free to use under CC BY 4.0 with a link to this page.

The pattern is a single sharp peak. In the 90 days before the solar permit, 6.5% of homes took out a re-roof permit — a yearly rate of about 26%, many times the normal 1.4%. Another 4.2% re-roofed in the 90 days after, in many cases likely the same project with the roofing permit filed second. Owners and installers clearly time the roof with the solar job: replacing an old roof first avoids paying later to take the panels off and put them back. How the two jobs fit together: a new roof and solar at the same time and should you replace your roof before solar.

After installation: compared with similar homes

Yearly re-roof rate: solar homes after installation and similar homes without solar
GroupRe-roofs a year
Solar homes, 90 days to 3 years after the solar permit1.3%
Solar homes, 1 to 2 years after1.1%
Solar homes, 2 to 3 years after1.1%
Solar homes, 3 to 1 years before the solar permit1.8%
Similar homes without solar, 20201.5%
Similar homes without solar, 20211.1%
Similar homes without solar, 20221.2%
Similar homes without solar, 20231.7%
Similar homes without solar, 20241.6%
Similar homes without solar, 20251.3%
Similar homes: City of Los Angeles one- and two-family homes that appear in the 2019 permit data through a permit unrelated to roofing or solar, weighted to the ZIP codes of the solar homes.

Once the panels were up, solar homes did not re-roof any sooner than their neighbors: 1.3% a year against 1.4%, and only about 1% a year in years two and three. Part of that is the roofs themselves — many were brand new — and part may be that owners put off a re-roof that now means removing the array. Three years is a short window, though, and roofs age; leaks and repairs that do not need a permit are not in these records. Whether panels damage a roof, and what the mounts do to it: do solar panels damage your roof.

How likely is a remove-and-reinstall?

Share of solar homes expected to re-roof, if the first three years’ rate held
WithinShare of homes (model)
10 yearsat least 13%
20 yearsat least 24%
25 yearsat least 29%
Model: a constant 1.3% a year. Roofs age, so the real rate is likely to rise over time; read these as floors, not forecasts.

Each re-roof on a solar home means taking the array off and putting it back. If the measured 1.3% a year held, at least 13% of solar homes would face that within 10 years and 29% within 25 — and more if roofs age into replacement. That is the main reason to look hard at the roof before installing; what removal and reinstallation involves is in solar removal and reinstall for a roof.

Methodology

Solar homes
City of Los Angeles addresses with an electrical permit for solar on a one- or two-family dwelling, from the LADBS permit dataset covering January 2019 to May 2023; the date is the first solar permit, July 2019 or later. 11,106 homes.
Re-roofs
Building permits for re-roofing on one- or two-family dwellings: in the older dataset by work description (“re-roof”), in the current LADBS building permit dataset (2020 – May 2026) by its roofing flag; duplicates removed by permit number. 68,012 permits.
Matching
By house number, the first word of the street name (without N, S, E or W) and ZIP code.
Similar homes
50,879 one- and two-family addresses that appear in 2019 through a permit unrelated to roofing or solar and never took out a solar permit; their share re-roofing in each calendar year 2020–2025, weighted to the solar homes’ ZIP codes.
Limits
City of Los Angeles only (LADWP territory). Unpermitted re-roofs and repairs are not seen. Solar homes after May 2023 are not in the older dataset.

Sources: City of Los Angeles, LADBS Building and Safety permits (data.lacity.org): permits issued 2019 – May 2023 and building permits issued 2020 – May 2026.

Frequently asked questions

Do solar panels make you need a new roof sooner?

Not in Los Angeles permit records. In the three years after installation, solar homes re-roofed at 1.3% a year, about the same as similar homes without solar (1.4%).

How many people replace their roof when they go solar?

About one in ten: 10.7% of LA solar homes took out a re-roof permit within 90 days of the solar permit, 6.5% of them in the 90 days before.

How often do solar panels have to be removed for a new roof?

At the measured rate after installation, at least 13% of solar homes would re-roof within 10 years and 24% within 20, each time removing and reinstalling the array.

Should I replace my roof before installing solar?

If it is near the end of its life, the records suggest many owners do: re-roof permits spike in the 90 days before the solar permit. See should you replace your roof before solar.

Do solar panels damage roofs?

Permit records cannot see leaks or repairs, only re-roofs, and those did not come sooner after solar. How mounts and flashing protect a roof is explained in do solar panels damage your roof.