Canoga Park · LADWP / LADBS

Main panel upgrade in Canoga Park, CA

Cali Energy replaces main electrical panels in Canoga Park for solar and batteries. On a Canoga Park house we replaced the service panel with a 200-amp main breaker so a new array had a compliant point of connection, on an express permit pulled the same day as the solar one, and closed it within five weeks of the roofing permit.

In Canoga Park, as across the City of Los Angeles, qualifying solar and service panel work can go through LADBS as express permits, without plan check. On our 2021 Canoga Park project the solar and service panel express permits were paid on the same day, the panel permit finaled on 23 October and the solar permit two days later, and with the roofing permit before them, all three closed within five weeks. LADWP connects the result.

Solar modules and mounting rails on a new composition shingle roof, Canoga Park
Modules going on over shingle that was three weeks old.

How a panel upgrade runs in Canoga Park

  • A compliant point of connection. The code caps the main breaker plus the solar breaker at 120% of the busbar rating. Where the existing panel cannot take the array that way, it is replaced or the main breaker is derated. Derate, new panel or service upgrade
  • Express permits. LADBS issues qualifying solar and service panel permits as express permits, with no plan check. We pull them together so both inspections can be booked in one sequence.
  • The houses. Canoga Park's single-family homes have a median build year of 1960; 48.2% of the 10,513 were built before 1960.
  • LADWP sets the meter and grants permission to operate after the city's finals.

Roof, panel and solar in five weeks

On our 2021 Canoga Park project the roof came first: the roofing permit was issued on 24 September, the sheathing inspection was signed on 1 October and the roofing final passed on 6 October. Two days later we paid the solar and service panel express permits on the same day, installed a new service panel with a 200-amp main breaker and the array on microinverters flashed into the new shingle, and requested the inspections. The service panel permit finaled on 23 October and the solar permit on 25 October. Roofing in Canoga Park

After the switch-on

When one microinverter on the same Canoga Park system stopped producing ten months later, the monitoring showed it, and we carried the manufacturer's warranty claim and fitted the replacement. Solar repair in Canoga Park

Our Canoga Park panel project

Flashed mounting attachment on composition shingle, Canoga Park
Canoga Park, CA · September 2021 – August 2022 · LADWP / LADBS

Forty-two squares first. Then the array and the panel.

A new service panel with a 200-amp main breaker for a new array, on an express permit; the panel permit finaled on 23 October 2021 and the solar two days later.

Steps in Canoga Park

  1. Check. Panel label, busbar, main breaker and a load calculation against the array.
  2. Permits with LADBS: express permits for the solar and the service panel where the work qualifies.
  3. Installation under our C-10 electrical license.
  4. Inspections on both permits, booked together.
  5. LADWP sets the meter and grants permission to operate.

Nearby. Main panel upgrades in Woodland Hills · Northridge · Encino · All our Canoga Park projects

Panel upgrade questions for Canoga Park

Does Cali Energy do main panel upgrades in Canoga Park?

Yes. Cali Energy replaces main panels in Canoga Park under its C-10 electrical license, with LADBS permits and LADWP's meter work. CSLB #1032379, based in Northridge; call +1-323-844-7777.

Is a panel upgrade a fast permit in Canoga Park?

When the work qualifies, yes: LADBS issues it as an express permit with no plan check. On our 2021 Canoga Park project the panel permit was paid with the solar one and finaled fifteen days later.

Can the roof, the panel and the solar be done together?

Yes. On our 2021 Canoga Park project the roof, the service panel and the solar each had their own permit, and all three closed within five weeks of the roofing permit being issued.

What size panel does solar need?

It depends on the array and the house. On our Canoga Park project a new service panel with a 200-amp main breaker gave the array a compliant point of connection.

Find out what your Canoga Park panel can take

Send a photo of your main panel's label and a recent LADWP bill. We will tell you whether the panel can take what you are adding, and whether the work qualifies for express permits.

Get a Canoga Park panel quote Call +1-323-844-7777